Clean it from
the ground
Scaffolding, scissor lifts and cherry pickers are the expensive part of cleaning at height — and the risky part. The C10 washes facades from the ground with a continuous, soft wash through to 200 bar. No shutdowns, no scaffolding, just fast, flawless results.
Anything with a face
and no safe way up it
Silos and Tanks
Grain silos, process tanks and storage vessels washed down without confined-space or height permits.
Building Facades
Cladding, render and glazing on commercial buildings, with no swing stage and no street closure.
Solar Arrays
Panel washing across ground-mount farms and roof arrays, restoring yield without walking the modules.
Structural Steel
Towers, gantries, bridges and plant structures prepared for inspection or coating.
The access
cost disappears
On a conventional clean, most of the invoice and nearly all of the risk sits in getting a person to the surface. A drone crew arrives, sets up on the ground and starts.
How much wall per hour
Square metres cleaned per hour on a vertical face, by working height and cleaning speed.
| Height | Flight Time | Cycle Time | Cycles / HR | Slow 0.3 M/S | Standard 0.4 M/S | Light 0.5 M/S |
|---|---|---|---|---|---|---|
| Up to 10 m | 16.2 min | 19.2 min | 3.13 | 639 m² | 851 m² | 1,064 m² |
| Up to 20 m | 14.4 min | 17.4 min | 3.45 | 624 m² | 835 m² | 1,042 m² |
| Up to 30 m | 12.6 min | 15.6 min | 3.85 | 612 m² | 816 m² | 1,020 m² |
Baseline Assumptions
- Pressure 180 bar
- Spray width 0.7 m
- Battery life (base) 18 min
- Battery swap 3 min
- Height impact rule 10% battery per 10 m of hose
- Surface orientation Vertical
These figures are theoretical calculations against standardised assumptions, not guaranteed benchmarks. Real performance varies with operator skill, surface material and level of soiling, wind, temperature and humidity, hose management and water supply, battery condition and payload weight. Treat them as general guidance and validate with field testing on the actual site.
See the C10 in operation
Quick Start Guide
View on Youtube →
Vertical Auto Operations
View on Youtube →
Cleaning Station
View on Youtube →
Use Case — Part 1
Industrial Facade
Use Case — Part 2
Commercial Windows
Full Video Library
All guides and cases
C10
Contractors running regular height work generally stop hiring the service and buy the airframe. Training, spares and accredited maintenance are quoted with it.
View Cleaning DronesSpecifications
- Working height60 m
- Flow rate15 L/min
- Pressure200 bar (2900 PSI)
- DetectionCollision radar
- DeploymentGround crew, no scaffold